Even before the accident, the Challenger launch didn’t go off without a hitch, as NASA had hoped. The fi rst launch date had to be abandoned due to a cold front expected to move through the area. The front stalled, and the launch could have taken place on schedule. But the launch had already been postponed in deference to Vice President George Bush, who was to attend. NASA didn’t want to antagonize Bush, a strong NASA supporter, by postponing the launch due to inclement weather after he had arrived. The launch of the shuttle was further delayed by a defective microswitch in the hatch-locking mechanism. When this problem was resolved, the front had changed course and was now moving through the area. The front was expected to bring extremely cold weather to the launch site, with temperatures predicted to be in the low 20’s (°F) by the new launch time.

Given the expected cold temperatures, NASA checked with all of the shuttle contractors to determine if they foresaw any problems with launching the shuttle in cold temperatures. Alan McDonald, the director of Thiokol’s Solid Rocket Motor Project, was concerned about the cold weather problems that had been experi- enced with the solid rocket boosters. The evening before the rescheduled launch, a teleconference was arranged between engineers and management from the Kennedy Space Center, NASA’s Marshall Space Flight Center in Huntsville, Alabama, and Thiokol in Utah to discuss the possible effects of cold temperatures on the performance of the solid rocket boosters. During this teleconference, Roger Boisjoly and Arnie Thompson, two Thiokol engineers who had worked on the solid- propellant booster design, gave an hour-long presentation on how the cold weather would increase the problems of joint rotation and sealing of the joint by the O-rings.

The engineers’ point was that the lowest temperature at which the shuttle had previously been launched was 53°F, on January 24, 1985, when there was blow-by of the O-rings. The O-ring temperature at Challenger’s expected launch time the fol- lowing morning was predicted to be 29°F, far below the temperature at which NASA had previous experience. After the engineers’ presentation, Bob Lund, the vice president for engineering at Morton Thiokol, presented his recommendations. He reasoned that since there had previously been severe O-ring erosion at 53°F and the launch would take place at signifi cantly below this temperature where no data and no experience were available, NASA should delay the launch until the O-ring tem- perature could be at least 53°F. Interestingly, in the original design, it was specifi ed that the booster should operate properly down to an outside temperature of 31°F.

Larry Mulloy, the Solid Rocket Booster Project manager at Marshall and a NASA employee, correctly pointed out that the data were inconclusive and disagreed with the Thiokol engineers. After some discussion, Mulloy asked Joe Kilminster, an engi- neering manager working on the project, for his opinion. Kilminster backed up the recommendation of his fellow engineers. Others from Marshall expressed their disagreement with the Thiokol engineers’ recommendation, which prompted Kilminster to ask to take the discussion off line for a few minutes. Boisjoly and other engineers reiterated to their management that the original decision not to launch was the correct one.

A key fact that ultimately swayed the decision was that in the available data, there seemed to be no correlation between temperature and the degree to which blow-by gasses had eroded the O-rings in previous launches. Thus, it could be con- cluded that there was really no trend in the data indicating that a launch at the expected temperature would necessarily be unsafe. After much discussion, Jerald Mason, a senior manager with Thiokol, turned to Lund and said, “Take off your engineering hat and put on your management hat,” a phrase that has become

Chapter 1 Introduction 11

famous in engineering ethics discussions. Lund reversed his previous decision and recommended that the launch proceed. The new recommendation included an indication that there was a safety concern due to the cold weather, but that the data were inconclusive and the launch was recommended. McDonald, who was in Florida, was surprised by this recommendation and attempted to convince NASA to delay the launch, but to no avail.